Water Supply Schemes

Water Supply Schemes

GREATER AIZAWL WATER SUPPLY SCHEME PHASE - I

Location of the scheme

Nature of scheme

Population

a) Initial stage

b) Intermediate stage

c) Ultimate stage

Total quantity of water produced

a) Initial stage

b) Intermediate

c) Ultimate

Rate of Supply as per Norm

Present Rate of Supply

Source

Discharge

Static Head

Total Head

Estimate cost

Per capita cost

Year of commencement

Year of completion

No. of house connection

Percentage population coverage

Funding pattern

Agency for implementation

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

Aizawl.

Pumping.

2,28,280 (2001 Census).

57890

74,493

80,000

NIl

07.82 mld

10.05 mld

10.80 mld

135 lpcd

30 lpcd

River Tlawng

7.549 lps

PH-I to PH-II= 552.28 m PH-I to Main Reservoir= 485.64 m

PH-I to PH-II = PH-I to Main Reservoir =1030m

Rs.18,00,00,000/-

Rs.2250/-

1984 AD

1988 AD•

26179

35%

100% State

PHED

GREATER AIZAWL WATER SUPPLY SCHEME PHASE - II
GREATER AIZAWL WATER SUPPLY SCHEME
PHASE - II

Location of the scheme

Nature of scheme

Population

a) Initial stage

b) Intermediate stage

c) Ultimate stage

a) Initial stage

b) Intermediate

c) Ultimate

Rate of Supply

Present Rate of Supply

Source

Discharge

Static Head

Estimate cost

Per capita cost

Year of commencement

No. of house connection

Percentage population coverage

Funding pattern

Agency for Implementation

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

Aizawl

Pumping

2,28,280 (2001 Census)

90453

1,95,800

3,10,000

7.05 mld

15.27 mld

24.18 mld

78 lpcd

45 lpcd

River

Tlawng 121000 lps

Raw = 305 m and Clear = 740 m

Rs.113,47,00,000/-

Rs.3660/-

1999 AD

26179

100%

75:25 DoNER and State

PHED

GREATER LUNGLEI WATER SUPPLY SCHEME

Location of the scheme

:

Lunglei

Nature of scheme

:

Pumping

Population

:

47137 (2001 Census)

a) Initial stage

:

29476

b) Intermediate stage

:

40453

c) Ultimate stage

:

66000

Total quantity of water produced

a) Initial stage

:

3.979 mld

b) Intermediate

:

5.461 mld

c) Ultimate

:

9.00 mld (8.910+0.09)

Rate of Supply as per Norm

:

135 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

Tlawng

Discharge

:

805.56 lps

Static Head

:

791 m

Total Head

:

889 m

Estimate cost

:

Rs.22,54,00,000/-

Per capita cost

:

Rs.3415/-

Year of commencement

:

1990

Year of completion

:

1994-1995

No. of house connection

:

5465

Percentage population coverage

:

100%

Funding pattern

:

100% State

Implementing Agency

:

PHED

GREATER CHAMPHAI WATER SUPPLY SCHEME

Location of the scheme

:

Champhai

Nature of scheme

:

Pumping

Population

:

26465 (2001 Census)

a) Initial stage

:

26430

b) Intermediate stage

:

38294

c) Ultimate stage

:

49420

Total quantity of water produced

a) Initial stage

:

1.62 mld

b) Intermediate

:

2.60 mld

c) Ultimate

:

3.40 mld

Rate of Supply

:

70% of the population - 70 lpcd 30% of the population - 40 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

River Tuipui

Discharge

:

400 lps

Static Head

:

688 m

Total Head

:

1st=705m and 2nd=710m

Estimate cost

:

Rs.22,70,10,000/-

Per capita cost

:

Rs.4593/-

Year of commencement

:

2001 AD

Year of completion

No. of house connection

:

1

Percentage population coverage

:

100%

Funding pattern

:

100% DoNER

Implementing Agency

:

PHED

GREATER KOLASIB WATER SUPPLY SCHEME

Location of the scheme

:

Kolasib

Nature of scheme

:

Pumping

Population

:

19008 (2001 Census)

a) Initial stage (as per 1991 census)

:

15050

b) Intermediate stage

:

21522

c) Ultimate stage

:

32000

Total quantity of water produced

a) Initial stage

:

1.053 mld

b) Intermediate

:

1.506 mld

c) Ultimate

:

2330 (2.24 + 0.09) mld

Rate of Supply

:

70 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

Tuichhuahen

Discharge

:

155.90 lps

Static Head

:

626.29 m

Total Head

:

669.84 m

Estimate cost

:

Rs.14,52,20,000/-

Per capita cost

:

Rs.4538/-

Year of commencement

Year of completion

:

1998-1999

No. of house connection

:

1294

Percentage population coverage

:

100%

Funding pattern

:

100% State

Implementing Agency

:

PHED

GREATER SAIHA WATER SUPPLY SCHEME

Location of the scheme

:

Saiha

Nature of scheme

:

Gravity

Population

:

19826 (2001 Census)

a) Initial stage

:

13659

b) Intermediate stage

:

14877

c) Ultimate stage

:

30000

Total quantity of water produced

a) Initial stage

:

0.273 mld

b) Intermediate

:

0.297 mld

c) Ultimate

:

0.600 mld

Rate of Supply

:

70 lpcd

Present Rate of Supply

:

20 lpcd

Source & Discharge

:

1. Zotlanglui-I=0.43lps

2. Zotlanglui-II=1.06 lps

3. Bawihtelui Upper = 0.99 lps

4. Bawihtelui Lower = 5.99 lps

5. Saihatlanglui=8.00lps

6. Lakherchavalui = 1.00 lps

7. PHE Lui = 7.67 lps

Static Head

:

1. Zotlanglui-I=23.75 m

2. Zotlanglui - II = 101.75m

3. Bawihtelui Upper = 20m

4. Bawihtelui Lower=79.20 m

5. Saihatlanglui=40.08 m

6. Lakherchavalui = 11.76m

7. PHE Lui = 56.13 m

Terminal Head

:

Saihatlanglui = 2.00 m

PHE Lui = 26.87 m

Bawihtelui = 5.863 m

Lakherchavalui = 2.50 m

Estimate cost

:

Rs.3,98,00,000/-

Per capita cost

:

Rs.1327/-

Year of commencement

:

1994 AD

Year of completion

:

1999-2000

No. of house connection

:

1210

Percentage population coverage

:

29%

Funding pattern

:

100% State

Agency per implementation

:

PHED

GREATER MAMIT WATER SUPPLY SCHEME

Location of the scheme

:

Mamit

Nature of scheme

:

Pumping

Population

:

5261 (2001 Census)

a) Initial stage

:

5261

b) Intermediate stage

:

7279

c) Ultimate stage

:

8993

Total quantity of water produced

a) Initial stage

:

0.379 mld

b) Intermediate

:

0.494 mld

c) Ultimate

:

0.610 mld

Rate of Supply : 70 lpcd 70% of the population : 40 lpcd 30% of the population

Present Rate of Supply

:

70 lpcd

Source

:

Tut River

Discharge

:

110 lps

Static Head

:

830 m

Total Head

:

850 m

Estimate cost

:

Rs.5,76,81,000/-

Per capita cost

:

Rs.6414/-

Year of commencement

:

2003 AD

Year of completion

No. of house connection

:

17

Percentage population coverage

:

83%

Funding pattern

:

100% DoNER

Agency per implementation

:

PHED

GREATER SERCHHIP WATER SUPPLY SCHEME

Location of the scheme

:

Serchhip

Nature of scheme

:

Pumping

Population

:

25000 (Design)

a) Initial stage

:

13680

b) Intermediate stage

:

19340

c) Ultimate stage

:

25000

Total quantity of water produced

a) Initial stage

:

0.40 mld

b) Intermediate

:

1.00 mld

c) Ultimate

:

1.60 mld

Rate of Supply as per Norm

:

70 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

River Tuikum

Discharge

:

40 lps

Static Head

:

454 m

Total Head

:

480 m

Estimate cost

:

Rs.11,20,00,000/-

Per capita cost

:

Rs.4480/-

Year of commencement

:

1993

Year of completion

:

1997

No. of house connection

:

1195

Percentage population coverage

:

100%

Funding pattern

:

100% State

Implementing Agency

:

JEP & PHED

GREATER BAIRABI WATER SUPPLY SCHEME

Location of the scheme

:

Bairabi

Nature of scheme

:

Gravity

Population

:

3304 (2001 Census)

a) Initial stage

:

3727

b) Intermediate stage

:

5120

c) Ultimate stage

:

7454

Total quantity of water produced

a) Initial stage

:

0.167 mld

b) Intermediate

:

0.230 mld

c) Ultimate

:

0.335 mld

Rate of Supply

:

70 lpcd

Present Rate of Supply

:

45 lpcd

Source

:

Thuampuilui=2.272 lps

Biakhluna Vaului=0.757lps

Vankhuma Lui =(2.25+ 2.27) = 4.52 lps

Discharge

:

7.549 lps

Static Head

:

Thuampuilui = 30 m

Biakhluna Vaului=20m

Vankhuma Lui = 50m and 58 m

Terminal Head

:

Thuampuilui = 8.68 m

Biakhluna Vaului = 12.85m

Vankhuma Lui = 6.02 m and 31.27 m

Estimate cost

:

Rs.77,54,000/-

Per capita cost

:

Rs.1040/-

Year of commencement

:

2001 AD

Year of completion

:

2002 AD

No. of house connection

:

90

Percentage population coverage

:

64%

Funding pattern

:

ARWSP

Agency for implementation

:

PHED

HNAHTHIAL WATER SUPPLY SCHEME (Aug.)

Location of the scheme

:

Hnahthial

Nature of scheme

:

Gravitation

Population

:

7138 (2001 Census)

a) Initial stage

:

6375

b) Intermediate stage

:

7138

c) Ultimate stage

:

8283

Total quantity of water produced

a) Initial stage

:

0.191 mld

b) Intermediate

:

0.214 mld

c) Ultimate

:

0.248 mld

Rate of Supply as per Norm

:

70 lpcd

Present Rate of Supply

:

30 lpcd

Source

:

Melkhat Lui

Discharge

:

0.99 lps

Static Head

:

350 m

Available Head

:

18.35 m

Estimate cost

:

Rs.72,64,000/-

Per capita cost

:

Rs.877/-

Year of commencement

Year of completion

:

20.3.1993

No. of house connection

:

272

Percentage population coverage

:

43%

Funding pattern

:

ARWSP

Implementing Agency

:

PHED

KHAWZAWL WATER SUPPLY SCHEME (Aug)

Location of the scheme

:

Khawzawl

Nature of scheme

:

Gravitation

Population

:

10954 (2001 Census)

a) Initial stage

:

7104

b) Intermediate stage

:

9700

c) Ultimate stage

:

12750

Total quantity of water produced

a) Initial stage

:

0.426 mld

b) Intermediate

:

0.582 mld

c) Ultimate

:

0.765

Rate of Supply

: 70 lpcd

Present Rate of Supply

:

60 lpcd

Source

:

Tumkhuai River

Discharge

:

4.783 lps

Static Head

:

255.00 m

Terminal Head

:

88.50 m

Estimate cost

:

Rs.3,03,00,000/-

Per capita cost

:

Rs.2376/-

Year of commencement

:

1999 AD

Year of completion

No. of house connection

:

657

Percentage population coverage

:

86%

Funding pattern :

50 : 50 Central

THENZAWL GREATER WATER SUPPLY SCHEME

Location of the scheme

:

Thenzawl

Nature of scheme

:

Gravity Scheme

Population

:

5607 (2001 Census)

a) Initial stage

:

4502

b) Intermediate stage

:

5607

c) Ultimate stage

:

9891

Total quantity of water produced

a) Initial stage

:

0.515 mld

b) Intermediate

:

0.392 mld

c) Ultimate

:

0.692 mld

Rate of Supply

:

70 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

Charpui Lui and Phulkawn Lui

Discharge

:

3.00 lps and 1.66 lps

Static Head

:

53 m and 331 m

Terminal Head

:

18.90 m and 15.828 m

Estimate cost

:

Rs.1,46,45,000/-

Per capita cost

:

Rs.1481/-

Year of commencement

:

1999 AD

Year of completion

:

11.3.2002

No. of house connection

:

147

Percentage population coverage

:

100%

Funding pattern

:

50 : 50 AUWSP : State

Implementing Agency

:

PHED

VAIRENGTE COMPOSITE WATER SUPPLY SCHEME

Location of the scheme

:

Vairengte

Nature of scheme

:

Pumping

Population

:

7715 (2001 Census)

a) Initial stage

:

5607

b) Intermediate stage

:

13914

c) Ultimate stage

:

16000

Total quantity of water produced

a) Initial stage

:

0.392 mld

b) Intermediate

:

0.974 mld

c) Ultimate

:

1.120 mld

Rate of Supply as per Norm

:

70 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

Aitlang Lui

Discharge

:

37.20 lps

Static Head

:

210 m

Total Head

:

293 m

Estimate cost

:

Rs.3,22,88,000/-

Per capita cost

:

Rs.2018/-

Year of commencement

:

2000 AD

Year of completion

:

12/2002

No. of house connection

:

438

Percentage population coverage

:

100%

Funding pattern

:

50 : 50 AUWSP : State

Implementing Agency

:

PHED

SAITUAL WATER SUPPLY SCHEME (Aug)

Location of the scheme

:

Saitual

Nature of scheme

:

Gravity

Population

:

10966 (2001 Census)

a) Initial stage

:

8310

b) Intermediate stage

:

9500

c) Ultimate stage

:

10803

Total quantity of water produced

a) Initial stage

:

0.582 mld

b) Intermediate

:

0.665 mld

c) Ultimate

:

0.756 mld

Rate of Supply

:

70 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

Maite Zotui = 4.545lps.

Thankhuma Dil = 1.136 lps.

Discharge

:

5.675 lps

Static Head

:

Maite Zotui = 165 m

Thankhuma Dil = 208m

Available Head

:

Maite Zotui =

hankhuma Dil =

Estimate cost

:

Rs.1,54,94,000/-

Per capita cost

:

Rs.1434/-

Year of commencement

:

1999

Year of completion

No. of house connection

:

280

Percentage population coverage

Funding pattern

:

50:50 (AUWSP : State)

Implementing Agency

:

PHED

DARLAWN WATER SUPPLY SCHEME

Location of the scheme

:

Darlawn

Nature of scheme

:

Pumping

Population

:

3865 (2001 Census)

a) Initial stage

:

3600

b) Intermediate stage

:

3865

c) Ultimate stage

:

5400

Total quantity of water produced

a) Initial stage

:

0.216 mld

b) Intermediate

:

0.232 mld

c) Ultimate

:

0.324 mld

Rate of Supply

:

70 lpcd

Present Rate of Supply

:

60 lpcd

Source

:

Tuitung and Sakeizim

Discharge

:

6.655 lps

Static Head

:

310 m

Total Head

:

345 m

Estimate cost

:

Rs.1,12,08,000/-

Per capita cost

:

Rs.2,038/-

Year of commencement

Year of completion

:

31-4-1998

No. of house connection

:

67

Percentage population coverage

:

86%

Funding pattern

:

50:50% AUWSP : State

Implementing Agency

:

PHED

TLABUNG WATER SUPPLY SCHEME (Aug.)

Location of the scheme

:

Tlabung

Nature of scheme

:

Gravitation

Population

:

3681 (2001 Census)

a) Initial stage

:

1200

b) Intermediate stage

:

1400

c) Ultimate stage

:

1680

Total quantity of water produced

a) Initial stage

:

0.042 mld

b) Intermediate

:

0.049 mld

c) Ultimate

:

0.059 mld

Rate of Supply as per Norm

:

70 lpcd

Present Rate of Supply

:

35 lpcd

Source

:

Zohmunlui

Discharge

:

0.533 lps

Static Head

:

120 m

Available Head

:

48.50 m

Estimate cost

:

Rs.8,29,00,000/-

Per capita cost

:

Rs.5314/-

Year of commencement

:

1999 AD

Year of completion

:

2002 AD

No. of house connection

:

191

Percentage population coverage

:

50%

Funding pattern

:

ARWSP

Implementing Agency

:

PHED

LENGPUI WATER SUPPLY SCHEME (Aug.)

Location of the scheme

:

Lengpui

Nature of scheme

:

Gravitation

Population

:

2423

a) Initial stage

:

2423

b) Intermediate stage

:

3550

c) Ultimate stage

:

4600

Total quantity of water produced

a) Initial stage

:

0.169 mld

b) Intermediate

:

0.248 mld

c) Ultimate

:

0.322 mld

Rate of Supply

:

70 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

Challui and Hnawmphiah

Discharge

:

2.130 lps and 1.597 lps

Static Head

:

127 m

Terminal Head

:

94.29 m

Estimate cost

:

Rs.186.28/- lakhs

Per capita cost

:

Rs.4173/-

Year of commencement

:

2000 AD

Year of completion

No. of house connection

:

132

Percentage population coverage

:

100%

Funding pattern

:

50:50 AUWSP : State

Implementing Agency

:

PHED

N.KAWNPUI COMPOSITE WATER SUPPLY SCHEME

(Composite-Thingdawl, Bualpui, Sethawn and Mualvum )

Location of the scheme

:

N.Kawnpui

Nature of scheme

:

Pumping

Population

:

10596 (2001 Census)

a) Initial stage

:

8231

b) Intermediate stage

:

10596

c) Ultimate stage

:

20,000

Total quantity of water produced

a) Initial stage

:

0.576 mld

b) Intermediate

:

0.741 mld

c) Ultimate

:

1.680 mld

Rate of Supply

:

70 lpcd

Present rate of Supply

:

70 lpcd

Source

:

R.Tuitun and Chhimluang

Discharge

:

29.83 lps

Static Head

:

668 m

Total Head

:

730 m

Estimate cost

:

Rs.18,44,00,000/-

Per capita cost

:

Rs.9,220/-

Year of commencement

:

2000 AD

Year of completion

No. of house connection

Percentage population coverage

:

100%

Funding pattern

:

100% (State Plan)

Implementating Agency

:

PHED

SAIRANG WATER SUPPLY SCHEME (Aug.)

Location of the scheme

:

Sairang

Nature of scheme

:

Gravity Schemes

Population

:

5034 (2001 Census)

a) Initial stage

:

3145

b) Intermediate stage

:

3527

c) Ultimate stage

:

4938

Total quantity of water produced

a) Initial stage

:

0.220 mld

b) Intermediate

:

0.247 mld

c) Ultimate

:

0.345 mld

Rate of Supply

:

70 lpcd

Present Rate of Supply

:

70 lpcd

Source

:

Chhimluang Lui

Discharge

:

2.273 lps

Static Head

:

56 m

Terminal Head

:

11.45 m

Estimate cost

:

Rs.70,34,000/-

Per capita cost

:

Rs.1,424/-

Year of commencement

Year of completion

:

31-12-2004

No. of house connection

:

46

Percentage population coverage

:

100%

Funding pattern

:

50:50 AUWSP : State

Agency per implementation

:

PHED